Metric
|
Before
|
After
|
|---|---|---|
|
Roll-cage transfer time (G→1F)
|
35–40 min (cart + elevator wait)
|
90 sec
|
|
Transfers per shift
|
~70 (manual limited)
|
120+ (lift-limited)
|
|
Passenger elevator conflicts
|
Daily queues
|
Zero (goods separated)
|
|
Manual-handling complaints
|
9 logged in Q4
|
0 in 90 days
|
|
Ground-floor forklift dependency
|
High (escorted carts)
|
Reduced 40%
|
|
Unplanned downtime
|
n/a (new unit)
|
None in first quarter
|
“The lift turned our stairwell into a real logistics artery. We stopped treating vertical movement as a tax and started scheduling around it.”
|
Metric
|
Before
|
After
|
|---|---|---|
|
Roll-cage transfer time (G→1F)
|
35–40 min (cart + elevator wait)
|
90 sec
|
|
Transfers per shift
|
~70 (manual limited)
|
120+ (lift-limited)
|
|
Passenger elevator conflicts
|
Daily queues
|
Zero (goods separated)
|
|
Manual-handling complaints
|
9 logged in Q4
|
0 in 90 days
|
|
Ground-floor forklift dependency
|
High (escorted carts)
|
Reduced 40%
|
|
Unplanned downtime
|
n/a (new unit)
|
None in first quarter
|
“The lift turned our stairwell into a real logistics artery. We stopped treating vertical movement as a tax and started scheduling around it.”